IEEE 2800.2
P2800-2 - Test and Verification of BPS-connected Inverter-Based Resources WG

Announcement: After the March 2025 WG meeting, the WG voted to send the latest draft to IEEE-SA ballot. The initial IEEE-SA ballot is expected to open in early May 2025 and will remain open for 6 weeks.

Announcement: After the March 2025 meeting, WG voted to send the latest draft to IEEE-SA ballot. The initial ballot is expected to open in early May of 2025 and will remain open for 6 weeks.  

Title: Recommended Practice for Test and Verification Procedures for Inverter-based Resources (IBRs) Interconnecting with Bulk Power Systems

Scope: This document defines recommended practices for test and verification procedures that should be used to confirm plant-level conformance of inverter-based resources (IBRs) interconnecting with bulk power systems in compliance with IEEE Std 2800. The document applies to IBRs in transmission and sub-transmission systems, as defined by the connecting utility. The document may also apply to isolated IBRs that are interconnected to an alternating current (AC) transmission system via dedicated voltage source converter high-voltage direct current (VSC-HVDC) transmission facilities, e.g., offshore wind farms. This recommended practice complements the IEEE 2800 test and verification framework with specifications for the equipment, conditions, tests, modeling methods, and other verification procedures that should be used to demonstrate conformance with IEEE P2800 technical minimum requirements for interconnection, capability, and performance of applicable IBRs.

To indicate an interest in this project, please click the link below. https://development.standards.ieee.org/myproject-web/public/view.html#/interest/8899